Carbolite PTC 12/20/150 Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para Forno Carbolite PTC 12/20/150. Carbolite PTC 12/20/150 User Manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 16
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
MF11 3.08
Installation, Operation &
Maintenance Instructions
1200°C Thermocouple Calibration Furnace
type PTC 12/20/150
This manual is for the guidance of operators of the above Carbolite products
and should be read before the furnace is connected to the electricity supply.
This manual should supply all the information required for safe and trouble-
free furnace operation. Information on controller operation is included.
CONTENTS
section page
1.0 Symbols & Warnings 2
2.0 Installation 3
3.0 Operating Instructions 4
4.0 Controller Operation 6
5.0 Maintenance 11
6.0 Repairs & Replacements 12
7.0 Fault Analysis 14
8.0 Circuit Diagram 15
9.0 Fuses & Power Control 15
10.0 Specifications 16
Vista de página 0
1 2 3 4 5 6 ... 15 16

Resumo do Conteúdo

Página 1 - Maintenance Instructions

MF11 – 3.08 Installation, Operation & Maintenance Instructions 1200°C Thermocouple Calibration Furnace type PTC 12/20/150 This manual

Página 2 - YMBOLS & WARNINGS

PTC 10 MF11 – 3.08 4.11 Stopping the Timer To stop the timer at any time while it is running, change the StAt parameter to OFF. This is the sam

Página 3 - 2.0 INSTALLATION

PTC MF11 – 3.08 11 5.0 MAINTENANCE 5.1 General Maintenance No routine maintenance is required other than the occasional replacement of consuma

Página 4 - 3.0 OPERATING INSTRUCTIONS

PTC 12 MF11 – 3.08 6.0 REPAIRS & REPLACEMENTS 6.1 Safety Warning – Disconnection from Supply Always ensure that the furnace is disconnecte

Página 5

PTC MF11 – 3.08 13 6.5 Thermocouple Replacement Disconnect the furnace from the supply, and remove the furnace back panel (opposite the working

Página 6 - 4.0 CONTROLLER OPERATION

PTC 14 MF11 – 3.08 7.0 FAULT ANALYSIS A. Furnace Does Not Heat Up 1. The HEAT light is ON  The heating element has failed  Check also th

Página 7

PTC MF11 – 3.08 15 8.0 CIRCUIT DIAGRAM 8.1 Circuit Diagram 9.0 FUSES & POWER CONTROL 9.1 Fuses Supply Fuses: 32mm x 6mm t

Página 8

Carbolite, Parsons Lane, Hope, Hope Valley, S33 6RB, England. Telephone: +44 (0)1433 620011 Fax: +44 (0)1433 621198 E-mail: [email protected] The

Página 9

PTC 2 MF11 – 3.08 1.0 SYMBOLS & WARNINGS 1.1 Switches and Lights 1.2 Warning Symbols Instrument switch: when the instrum

Página 10

PTC MF11 – 3.08 3 2.0 INSTALLATION 2.1 Unpacking Unpack the furnace and remove the transit clamp from the working end of the furnace as follow

Página 11 - 5.0 MAINTENANCE

PTC 4 MF11 – 3.08 3.0 OPERATING INSTRUCTIONS 3.1 Operating Cycle The furnace is fitted with an instrument switch. The switch cuts off powe

Página 12 - EPAIRS & REPLACEMENTS

PTC MF11 – 3.08 5 diameter is 7.5mm - larger diameters may experience too much heat conduction and give an incorrect calibration. Insert the the

Página 13

PTC 6 MF11 – 3.08 4.0 CONTROLLER OPERATION 4.1 Eurotherm 2132 When switched on, the controller lights up, goes through a short test routine,

Página 14 - 7.0 FAULT ANALYSIS

PTC MF11 – 3.08 7 4.5 Altering the Ramp Rate It is possible to limit the rate of heating by setting a ramp rate only if the timer feature is no

Página 15 - 8.0 CIRCUIT DIAGRAM

PTC 8 MF11 – 3.08 4.7 Operation With the Timer The 2132 can be used as a process timer allowing timed heating or timed delay, according to the

Página 16 - 10.0 SPECIFICATIONS

PTC MF11 – 3.08 9 4.8 Setting the Timer Mode Scroll to tm.OP; use  or  to view and alter the mode. The mode shows as OPt.1 to OPt.5. It i

Comentários a estes Manuais

Sem comentários